|
![]() 52 1000 truckloads peel DHJanzen100055.jpg high resolution
|
|
So here you see 1000 truckloads of orange peel/pulp just placed in the 3 hectare biodegredation site. Each pile is a maximum of 1.5 m deep (31 January 1998). The piles were then leveled with a tractor by the company, and nature was allowed to run its course. |
back to lecture slides
or skip to: